
Timber Window Sash Replacement in Dunedin
Glass and Window Repair Dunedin makes and hangs replacement timber sashes. When a sash is past repairing but the frame around it is sound, a new sash goes into the opening you already have. The box frame, the architraves, the linings and the cladding are never touched.
- New sash made to the original profile and glass line
- Existing box frame, architraves and linings all stay
- Can be built to take a double glazed unit
Get your free quote
Four quick questions. Most quotes come back the same day.
It is the middle option almost nobody is offered, and in a city with the largest surviving collection of Victorian and Edwardian housing in New Zealand it should be the default answer far more often than it is. Full joinery replacement means cutting out the frame, disturbing the cladding and losing the original proportions. A new sash costs a fraction of that and nobody on the street can tell it happened.
When a sash is genuinely past repairing
We repair sashes far more often than we replace them, so this page exists for the cases where repair is no longer honest.
Rot through the full section
Scarfing works where sound timber remains either side of the damage. Once a bottom rail is soft through its whole thickness, or two rails and a stile have gone, there is not enough left to key new timber into.
Failed joints
Sashes are mortice and tenon jointed. When the glue has failed and the joints have opened, the sash racks out of square and no amount of filler holds it. That shows as a sash you can flex by hand at the corner.
Too thin for a sealed unit
Some early sashes are simply not deep enough in the rebate to carry a double glazed unit even after machining. Where the owner wants double glazing, a new sash built to the same external profile but a deeper rebate is the way to get it.
Matching what is already there
A replacement sash is worth nothing if it reads as new from the footpath. Four details carry the match.
The external profile of the rails and stiles, including any moulding. The glazing bar layout and thickness, which is what your eye actually reads at a distance. The glass line, meaning how far the pane sits back from the face. And the timber, which we specify for stability and paint holding rather than for cost. We take the old sash as the pattern wherever enough of it survives.
Double glazing a new sash
This is the main reason people choose replacement over repair. A new sash can be built with a deeper rebate from the start, which means a sealed unit goes in without machining away timber that was never designed to lose it.
Weight is the thing to plan for. A double glazed sash is roughly twice the weight of the single glazed one it replaces, so the cast iron weights get changed or added to and the cords are upgraded. Done at the same time it costs almost nothing. Done afterwards it is a second visit.
Making a sash that matches
Taking the old one as the pattern
Wherever enough of the original survives we use it as the pattern rather than working from measurements. Profiles from the villa era are not standard and a modern approximation reads as wrong even when the dimensions are right.
Four details carry the match: the external profile, the glazing bar layout and thickness, the glass line, and the timber species.
Building it for a sealed unit from the start
If double glazing is on the plan, the new sash gets a deeper rebate built in rather than machined out later. That keeps the section strong and means no timber is lost that was never meant to go.
The weights and cords get upgraded in the same visit for the extra load, which costs almost nothing while everything is already apart.
How Window and Glass Repair Dunedin approaches timber sash replacement in Dunedin
Dunedin has more original timber joinery still in service than any other New Zealand city. Most of it is repairable and the method is what decides whether the repair lasts.
Establish what is actually sound
Window and Glass Repair Dunedin probes the timber to find where decay stops, which is almost always further than it looks from the paint line. That defines the extent of the work before a price is given rather than after.
Take the sash out where possible
Bench work gives better access, a cleaner joint and the chance to deal with everything at once. The opening is secured while the sash is away rather than left open to a Dunedin winter.
Cut back and scarf in matched heartwood
Decayed timber is cut back to sound material and new heartwood spliced in with a long scarf joint, glued and fixed. Window and Glass Repair Dunedin does not fill rotten timber, because filler bridges the problem instead of removing it and it reappears at the edge of the repair within a few years.
Free the moving parts
A century of paint in the staff bead, the parting bead and the rebates is the most common reason a sash will not move. Stripping those surfaces back returns windows that have been painted shut for decades.
Replace cords, weights and pulleys as a set
On a double hung sash the counterbalance is a system. Window and Glass Repair Dunedin replaces the cord with waxed cotton of the correct diameter for the pulley and rebalances the weights to the actual mass of the repaired sash, which changes if it has been reglazed.
Draught proof while it is apart
Brush seals in the stiles and at the meeting rail go in during the same visit. Done separately it costs a second dismantling, and on a frosty Dunedin morning the meeting rail is the biggest single draught path in the house.
Reglaze, prime and reinstate
New putty or beads, and bare repaired timber primed the same day even where the finish coat is somebody else's scope. One wet week on unprimed end grain undoes the work.
Why timber sash replacement matters more in Dunedin
This is the city where original joinery is most worth saving and most at risk.
The largest Victorian and Edwardian stock in the country
What is in these houses cannot be bought again. Original sashes carry glass with visible ripple and joinery profiles that no modern manufacturer runs, so replacing them is a permanent loss rather than an upgrade.
Rot concentrates at the bottom rail and sill
The lowest horizontal surface takes every drop of water that gets past the glazing, and with fifty odd frost days a year it stays wet far longer than it would further north. That is why almost every timber repair here starts at the same place.
Restored timber outperforms its reputation
A properly repaired and draught proofed sash with a slim sealed unit performs far better than people expect, and it keeps the external appearance the house was designed around. The choice is rarely as stark as replace or freeze.
Heritage rules can apply
Work on a scheduled heritage building can need resource consent even where building consent is not required. Window and Glass Repair Dunedin checks the district plan schedule before quoting on anything that looks significant, rather than after.
What timber sash replacement costs in Dunedin and how long it takes
Timber work is priced by the hour and by the extent of decay, so the honest answer involves bands rather than a single figure.
Sash repair and rebalancing
Cords, weights, pulleys, freeing painted shut sashes and rebalancing is the most common job and it sits at the lower end. It is a day or two per window depending on how much paint has to come off and whether the sash comes to the bench.
Rot repair by scarfing
Cutting back to sound heartwood and splicing in new timber is priced by the length of the repair and the number of sections. Filling would be cheaper on the day and fails within a few years, so Window and Glass Repair Dunedin does not offer it as the cheap option.
Slim sealed units in original sashes
Where the rebate can take it, retrofitting a double glazed unit into the original sash runs roughly $800 to $1,250 per window including the rebalancing the added weight requires. It keeps the external appearance completely.
Against replacement
New timber joinery on a heritage house runs $800 to $1,250 per window and more where profiles have to be matched. Restoration is usually less, and it keeps original glass and joinery that cannot be bought again.
Restoration or replacement on a Dunedin villa
The decision is more open than people assume, and these are the four things that settle it.
How much sound timber is left
If the stiles and rails are sound and the decay is confined to the bottom rail and sill, restoration is straightforward and it is the better answer. Where decay has reached the joints the calculation shifts.
Whether the house is scheduled
Work on a scheduled heritage building can require resource consent even where building consent does not apply. Where that is the case, restoration is usually the only practical route and reversible additions are preferred.
What the original glass is worth
Early float and hand drawn glass has visible ripple that modern glass does not. Once it is gone it is gone, and on a Victorian or Edwardian house it is a large part of what the windows contribute.
What performance you actually need
A restored, draught proofed sash with a slim sealed unit performs far better than its reputation. It will not match thermally broken joinery, and on a character house the gap is usually a fair trade for keeping the building intact.
Timber Sash Replacement at a glance
- What is replaced
- The sash only, in the existing frame
- What stays
- Box frame, pulleys, weights, architraves, linings and cladding
- Matching
- External profile, glazing bar layout, glass line and timber species
- Glazing
- Single glazed with putty, or a deeper rebate for a sealed unit
- Balance
- Weights changed or added and cords upgraded for a double glazed sash
- Lead time
- Two to four weeks, with temporary glazing while the sash is off
Timber Sash Replacement in Dunedin: common questions
Can you make one sash to match the rest of the house?
Yes. We take the old sash as the pattern and match the profile, the glazing bar layout and the glass line, so it reads the same from the street.
Is a new sash cheaper than new joinery?
Considerably, because the frame, the architraves and the cladding are never touched. It is also far less disruptive.
Can a new sash be double glazed?
Yes, and it is the best time to do it. The rebate is built deep enough from the start rather than machined out later.
Recent Dunedin jobs
Got three quotes for retrofitting the front of the house. Only ones who measured every opening and explained why the south facing rooms needed different glass. Fourteen windows over three days and the difference in the mornings is obvious.
Landlord here. Had four flats assessed before the inspections. Two just needed sashes freed up and stays replaced rather than new joinery, which saved me a fortune. Straight answers and a written report I could hand over.
Slider had been jamming for years and we assumed it needed replacing. Turned out to be rollers and a bent track. Two hours, a fraction of the price we were braced for.
Fogged unit in the lounge, measured on the Tuesday and in by the following Monday. Fair price and they cleaned up after themselves.

Get a price for timber sash replacement in Dunedin
Free measure, fixed written quote, and a straight answer on whether it needs repairing or replacing.
Start your quote
Four questions and you are done.